As per funkymonk's orig post, it's trying to calc the first of the (next) mth, by adding enough days to get to the end of the curr mth (calc in seconds). It's actually an off-by-one error (in this case off by 1 day).
As mentioned, you should use a Date:: module to avoid fiddly details like different mth lengths and leap yrs.
-
Are you posting in the right place? Check out Where do I post X? to know for sure.
-
Posts may use any of the Perl Monks Approved HTML tags. Currently these include the following:
<code> <a> <b> <big>
<blockquote> <br /> <dd>
<dl> <dt> <em> <font>
<h1> <h2> <h3> <h4>
<h5> <h6> <hr /> <i>
<li> <nbsp> <ol> <p>
<small> <strike> <strong>
<sub> <sup> <table>
<td> <th> <tr> <tt>
<u> <ul>
-
Snippets of code should be wrapped in
<code> tags not
<pre> tags. In fact, <pre>
tags should generally be avoided. If they must
be used, extreme care should be
taken to ensure that their contents do not
have long lines (<70 chars), in order to prevent
horizontal scrolling (and possible janitor
intervention).
-
Want more info? How to link
or How to display code and escape characters
are good places to start.
|