The help I need is on how to manage two job lines and change their status simultaneously. While running, the second job may finish before the first and accordingly its status should change to "Finished" whereas the first job status would still show as "Running".
Just wanted to see how can these be programmed for 2 jobs for example. In practical I may need to manage 50 such jobs.
Thanks.
-
Are you posting in the right place? Check out Where do I post X? to know for sure.
-
Posts may use any of the Perl Monks Approved HTML tags. Currently these include the following:
<code> <a> <b> <big>
<blockquote> <br /> <dd>
<dl> <dt> <em> <font>
<h1> <h2> <h3> <h4>
<h5> <h6> <hr /> <i>
<li> <nbsp> <ol> <p>
<small> <strike> <strong>
<sub> <sup> <table>
<td> <th> <tr> <tt>
<u> <ul>
-
Snippets of code should be wrapped in
<code> tags not
<pre> tags. In fact, <pre>
tags should generally be avoided. If they must
be used, extreme care should be
taken to ensure that their contents do not
have long lines (<70 chars), in order to prevent
horizontal scrolling (and possible janitor
intervention).
-
Want more info? How to link
or How to display code and escape characters
are good places to start.
|